A New Building
On A Proven Frame.
Full cover replacements that give a sound steel frame another 15–20 years of service for a fraction of new-build cost.
When a cover reaches end of life, the building usually hasn't. Hot-dip galvanized frames routinely outlast two or three covers — which makes a recover the highest-value move in fabric building ownership: a new membrane, new hardware, and a new warranty on the structure you already own.
We measure your building, pre-order fabric to fit, and execute the recover in sections so your building is never left open overnight. Worn cables and hardware are replaced while the frame is exposed, and contents can usually stay in place under staged protection.
Fabric Cover Replacement FAQs
How do I know if I need a recover instead of a repair?
If damage is localized and the fabric has years of life left, repair. If the membrane is chalking, brittle, or failing in multiple areas, recover. Send photos — we'll tell you straight, and we do both.
How long does a recover take?
Most recovers complete in three to seven working days on site, depending on building size. Fabric lead time before mobilization is typically a few weeks.
Can my building stay in use during a recover?
Usually yes, with staged sections and protection for contents. We plan the sequence around your operation.
Get A Fixed Price
This Week.
Send your building details and what you need done — a real estimator replies within one business day.
Request a Quote